|
Weeks 15-17 Pictures
All doorknobs installed. All of the plumbing completed (sinks and shower accessories). Toilet paper holders and towel bars installed. Last in-wall speaker (center channel for TV) installed. Carpet installed on Friday morning which means we can start moving stuff back into the master bedroom. The bed is now out of the garage and in the room. Roman shades hung in bathroom and bedroom (1 of 3). TV wired up and hung. The inside of the house is just about done.
Almost there...
|