|
Weeks 12 and
13 Pictures
Tile (finally!) just about done. Master bathroom tiled and grouted. Hallway tiled, social bathroom granite floor put in. In-ceiling speakers installed for
surround sound system. Lots of electrical and other wiring items installed-- closet light (with
full spectrum bulmbs), ceiling fan, electrical outlets, and phone outlets. Split linen cabinets installed
in hallway (still trying to figure out what kind of top to put on the base cabinet).
House sandblasted in preparation for
new color coat of stucco being applied.
Hopefully we can get the plumbing and carpet installed next week. We are getting close to being done.
|