|
Week 14 Pictures
New door to the garage installed. Baseboards installed. All baseboards and casing painted. Tile done. Medicine cabinets and mirrors hung on the wall in the master bathroom. Shelves installed in the medicine cabinets (by stealing the pegs out of our DVD cabinet). Bathroom lights installed (2 over sinks, one over tub, and fluorescent for master bath area). Two toilets installed. One (of 3) sinks installed. Main shower installed along with thermostatic control.
Almost there...
|